Saturday, February 28, 2015

We are still on schedule to leave on Monday.

A new wrinkle though.  During the month we have talked to a number of old salts and were convinced that getting someone to get us over the hump was a smart thing to do.  Our new "Captain Ron" is a gentleman that is a licensed captain and an ASA instructor, Captain Norm Russick.  He has a challenging job teaching me. And he only has between St Pete and Key Biscayne to get it done.  Lauren is happy.

The latest catastrophe was a leaking gland.  The driveshafts from the engines go through the hull to the propeller and the glands are part of how they seal.  The guys we have paid a few boat bucks jumped all over this new problem with both feet.  Bill Krul (the warrior king) and Chris. They replaced both sides in an afternoon.  One of the interesting aspects was that they brought a diver in.  He goes under the boat and as the shaft comes out, he stuffs a t-shirt in the hole as the shaft comes out.  No kidding.  The hole vacated by the shaft is stuffed with a t-shirt.  The diver, Captain John, was in 68 degree marina water stuffing t-shirts.  We was  a Navy diver and possibly a SEAL, not quite sure, but quite interesting to talk to.

Got the sat phone working, but the dive compressor motor is giving me a problem.  Won't stay running under load.  Got to get that one figured out.

The weather looks great for Monday and a possible crossing on Sunday.

Another aspect of this voyage I am becoming convinced.  Crossing the Gulf Stream is not something to be taken lightly.  Captain Norm told a story of a 5 week period where boats we stacked up waiting for a weather window  to make the crossing.  You have to wait on wind from the South before the seas are calm enough.  I am hoping we have better luck schedule wise.



Wednesday, February 25, 2015

Still at the dock.  Fog the past 2 days.  But it did not matter anyway.  The problem with the VHF has been fixed.  The crappy 10 year old antenna just fell apart and was not working properly.  The guys working it ran a new antenna wire through the mast and I am glad that was not me at the top of the mast.

Now that we have VHF, we have to stop another leak in the boat.  There is a leak where the shaft exits the hull going to the propeller.  Need to get that solved.

We had a watermaker installed and we spent the day screwing it up.  Lauren got extremely frustrated. That has to get resolved too.

Another fun thing is that Lauren has worked hard follow all of the rules.  One is that there has to be the boat documentation number on the boat.  It has to be somewhere.  So, she put it on a board.  Cute.


Sunday, February 22, 2015

No pictures.  The camera card seems to have gone south before us.

Another frustrating day.  The refrigeration system is similar to that on a car.  There is a compressor that is belt driven from the port (left) engine.  It cools cold plates in the freezer. There is also a similar auto system that takes hot water heated in the engine and runs it through the water heater.  Except we did not get hot water.  We have some trouble shooting to do tomorrow.

The other problem we have to fix is the VHF radio.  We can receive, but not transmit.  Arrgh.

We are also meeting with an experienced captain that has some thoughts on how we should schedule out trip.  Via South End rather than Bimini.  Should be interesting.

The last 10% is taking more than we could have imagined.

Thursday, February 19, 2015

Lauren had folks over tonight for an opportunity for folks to check out the boat.  Grandma supplied the food and folks seemed to have a good time.  I think today was the coldest day of the year in St Pete.

Lauren, Melanie, Smiley and Grandma.


Tuesday, February 17, 2015

Something fun.  We put the name on the boat.  This process started months ago.  From discussion of the name.  Lauren and I have been calling the name of our boat Call Me The Breeze for quite a while.  We got push back from the yachting community about the name.  We heard "Too long", "you need to be able to understand the name in an emergency", "it is bad luck to change the name of your boat" and a myriad of other reasons.

Hey, we persevered.  She has a new name.


 

Sunday, February 15, 2015

Another long day on the boat.  I checked out the scuba gear and it all seems to work just fine.

I was fixing some of the light fixtures that light the stairs on either side of the boat, and did something to mess them up.  I think I shorted one of the fixtures, but did not trip the brfeaker.  Not sure what I did wrong...  Another thing to fix.

Lauren is making great progress cleaning and putting things away.  Finding a place for all the stuff is a real challenge.

My last big project is to build a shelf/floor to hold the scuba compressor.  Trying to pull the compressor in and out of the engine compartment every time we fill tanks is just not going to work.

The new table top is on, but still more stuff for which to find a place.


Saturday, February 14, 2015

Not so fast BBD.  We have not left yet!  Still so much to do.  Slowly but surely the to do list is getting shorter.  Picture of salon and the mess we still have.  Looks like another week before we get fit all together.



And Lauren hard at work....

One big project is what to do to store the scuba compressor.  This task could get complicated.  And what we have now is a real PITA.

After that we need to do a complete checkout of all the systems.  The radar and AIS work.  Even have a fish finder.  But the new inverter charger and water-maker need to get squared away and we know all the details on how to best use them.

It has been quite cool in St Pete.  Better than sweating and the weather in the northeast.

Thursday, February 12, 2015

We had an long day today.  Found out bad news about one of my best friends today. Still reeling about this news.  Nearly killed Lauren and I today on the highway.  We had the life raft in the back of the Navigator.  Someone in front of us pulled over in our lane and I instinctively swerved.  The life raft in back shifted and broke the back end lose and we were headed for the grass in the median.  Luckily the redneck in me got the Navi back straight and we kept going.  I was preparing for the truck rolling. Good news.  Bad news worse than the good news.

We spent time at the US Border and Customs office to get our SVRS cards.  These allow us to potentially reenter the country without having to go through customs and just call in when return to the states.  Typical government office.  More folks than work to do.

After that we took the liferaft for inspection.  As we suspected it was in poor condition.  But we let them inflate it and got to check it out.  We ended up having to buy a new one.  Another couple of boat bucks.



Thursday, February 5, 2015

Spent last weekend in St Pete getting lots of little projects either completed or near complete.  One item that we have been fretting over is the life raft.  The Coast Guard wants the liferaft inspected and certified.  Sounds simple.  Its a boat, noting is simple.  I did get the radio installed.  Another easy job that took more effort than expected. Unless I spliced into the harness on the boat (which I did not), I had to cut the connector out of the old radio and solder new wires onto the old connector.  I got pins made for a sub min D connector and soldered them onto the wire harness that came with the radio...

Bla, bla bla.   Happy to report the radio works great and you can even make a blue tooth connection from your phone.  Happy with this change.